The Problem
Maintaining the wastewater flows during construction or unplanned events like sewer breaks, pumping system failures or for rehabilitation is critical to maintaining service and compliance.
Solution
The Ted Berry Company can help design, plan, install and operate municipal bypass systems up to 80MGD and for durations from one hour to one month.
Results
Maine DOT was recently completing a motor bridge replacement project that consisted of replacement of a 10†force main attached to the existing bridge. Ted Berry Company designed and received approval from MDOT and Maine DEP to install a temporary HDPE force main around the bridge to operate for approximately 8 months including through a Maine winter and spring.